Renewable Energy Site Selection with GIS: A Suitability Analysis Guide

How to find sites for solar, wind and energy storage with GIS: exclusions, criteria, weighting, open global data and an interactive screening tool.

By Ahsan Mukhtar, CEO and Managing Director

Key takeaways

  • Remove the areas you cannot build on first, then score what is left.
  • Weights are a hypothesis; test how much the ranking changes when they move.
  • Screening shows where to look first; field studies still decide the site.

Finding land for a solar farm, a wind project or a battery storage plant starts with a simple question: where, across a whole region, could this work? Answering it by visiting sites one at a time is slow and misses good options. GIS suitability analysis answers it systematically. It removes the land you cannot use, scores the rest against the factors that matter, and produces a ranked shortlist for field studies.

Try it yourself: our Energy Site Screener screens about 2,600 km² of real terrain around Mount Isa, Queensland, for a gravity storage tower, a compressed-air plant, a solar field or a hybrid hub that would power a remote mine. Move the weights and the whole region re-scores in your browser.

The method in brief

Most renewable site selection follows the same pattern, often called multi-criteria decision analysis or weighted overlay:

  1. Define the project and its requirements
  2. Map the exclusions: land that is ruled out
  3. Map the criteria: factors that make land better or worse
  4. Normalise and weight the criteria
  5. Combine them into a suitability score
  6. Test the sensitivity of the result
  7. Shortlist and verify in the field

1. Define the project

Different technologies need different land. A utility-scale solar farm needs large, flat, sunny areas near the grid. Wind needs strong, steady wind and distance from homes. Battery storage needs a small, stable, flood-free site close to a substation or to the load it serves. Write down the size of the site, the technology and the connection point before choosing any data.

2. Map the exclusions first

Exclusions remove land outright, so they come before any scoring. Typical exclusions include:

  • protected areas and sensitive habitats
  • water bodies, wetlands and flood zones
  • urban areas, with setback buffers around homes
  • steep slopes beyond what the technology can use
  • airports, military land and heritage sites
  • existing mines, quarries and their safety zones

Combine them into a single constraints mask. Everything that survives is a candidate.

3. Map the criteria

Criteria vary in strength rather than ruling land in or out. Common ones are:

CriterionWhy it mattersTypical source
Solar irradiance or wind speedThe energy the site can produceGlobal Solar Atlas, Global Wind Atlas, local measurements
Slope and aspectConstruction cost and panel orientationDigital elevation models such as Copernicus DEM or SRTM
Land coverClearing, conflicts with farming or forestESA WorldCover, national land cover maps
Distance to the gridConnection cost and lossesUtility network data, OpenStreetMap power lines and substations
Distance to roadsAccess for construction and maintenanceOpenStreetMap, national road data
Ground stability and flood riskFoundations and resilienceGeology, flood studies, terrain analysis
Distance to the loadFor storage and off-grid supply, such as a mineThe client's own sites

Open global datasets make a first screening possible almost anywhere. A client's own data, such as site boundaries, grid capacity, geotechnical results and land tenure, then sharpens the result.

4. Normalise and weight

Each criterion is converted to a common scale, such as 0 to 100, so that kilometres, degrees and kilowatt-hours can be combined. Then each one gets a weight. Weights can come from a workshop with engineers and planners, or from a structured method such as the analytic hierarchy process (AHP), which derives weights from pairwise comparisons.

Either way, weights are a hypothesis. Record them and the reasoning behind them.

5. Combine into a suitability score

The weighted criteria are added up for every location to give a suitability score. Working on a regular grid of equal cells makes this simple and comparable. Hexagons work well, because every neighbour is the same distance away; systems such as H3 make them easy to index and join.

The result is a suitability map and a ranked list of the best areas, kept far enough apart to be genuinely different options.

6. Test the sensitivity

Change the weights and see what happens. If the same areas stay near the top whatever reasonable weights you choose, the result is robust. If small changes reshuffle the ranking, the decision depends on judgements that deserve more discussion and better data. An interactive tool makes this easy: let the project team move the weights themselves and watch the map respond.

7. Shortlist and verify

GIS screening shows where to look first. It does not replace a geotechnical investigation, a flood study, a grid connection study, an environmental assessment or a site visit. Use the shortlist to focus those studies on the areas most likely to succeed.

Common pitfalls

  • Scoring land that should have been excluded, so a high score hides a fatal constraint
  • Straight-line distances to the grid where terrain, rivers or land ownership force long detours
  • Old or coarse data, especially for land cover and grid infrastructure
  • One set of weights for every technology
  • Presenting the result as a decision rather than a shortlist

From analysis to a tool

A one-off map answers one question. An interactive screening tool lets the team ask the next one: a different technology, a stricter slope limit, a new grid connection. Our Energy Site Screener works this way, and the same scoring approach powers our Site Finder for retail branches. Our guide to branch site selection with GIS covers the same method for retail.

Summary

Renewable energy site selection with GIS removes what you cannot build on, scores the rest on the factors that matter, and tests how robust the ranking is. Use open global data for a first screening, sharpen it with your own, and give the team a tool they can explore. For utility and energy projects, see our work in utilities and electricity.